Highlights Of Our Experiences
Panel Review to conduct Auditing & Monitoring implementation of Projects in accordance to engineering and commercial specification under Dana Mudahcara funded managed by
TERAJU, PRIME MINISTER DEPARTMENT
Partnering for a Sustainable Future
Sabah Port SDN BHD
Hexagon Synergy and SPSB’s Commitment to Eco Friendly Maritime
Sludge Dewatering and Sludge Cake Packaging for PPTSB
PETRONAS PENAPISAN TERENGGANU SDN BHD
– Design, Build, Own & Operate the 1st onsite Oily Sludge Recovery Facility.
– Manage sludge to HSSB’s facility from collection/storage, dewater, drumming and packaging sludge cake, transfer to PP(T)SB in house Schedule Waste Shed.
– Successfully invented and supplied a homegrown technology ASDF (Advanced Sludge Dewatering Facility) for direct monetary saving to PPTSB.
Term Contract for Scheduled Waste Management for Pengerang Integrated Complex (PIC) Encompass Plants
PENGERANG INTEGRATED COMPLEX (PIC) PROJECT
– Awarded 5 contracts as appointed scheduled waste contractor.
– Manage scheduled waste generated in PIC premise including packaging and strapping, collection and loading/transportation of scheduled waste.
– Organize in-house training with the Petronas team for both PRPC UF and Prefchem to share knowledge on the legal requirements and SWM guidelines.
Appointed Scheduled Waste Manager for PENGERANG INTEGRATED COMPLEX (2020-current)
PETRONAS
Technical Specialist for the Development of the Procurement Strategy and Plant Specification
for Kuala Lumpur Waste to Energy Private Public Partnership Project in Malaysia.
UKAS, PRIME MINISTER’S DEPARTMENT
Lead Advisor Industrial Liquid Waste Detail Feasibility Study include, among others, Treatment Technology Assessment, National Strategic Planning and Administrative Control for The State of Qatar
UEM ENVIRONMENT
Design, Fabricate, Install, Own, Operate and Maintain Oily Sludge Pre Treatment Plant to complement and reduce operating cost of the existing treatment and recovery facilities.
KUALITI ALAM SDN BHD