Highlights Of Our Experiences

Panel Review to conduct Auditing & Monitoring implementation of Projects in accordance to engineering and commercial specification under Dana Mudahcara funded managed by TERAJU, PRIME MINISTER DEPARTMENT

Development and Construction of Port Reception Facility at Northport Bhd

PRF NORTHPORT MALAYSIA BHD (Completed) – First On-Site PRF In Malaysia

 

– Developed the engineering and process flow design for the PRF, ensuring it aligns with national and international regulations (IMO), and industry best practices.
– Fabrication of components and infrastructure for the PRF.
06 November 2024

Signing of a Memorandum of Understanding (MOU)

Strategic Partnership with CENVIRO GROUP

 

– Strong focus on onsite treatment and recovery of scheduled waste.
– Our efforts will also include recycling, repurposing and co-processing alternative fuels or raw materials from scheduled waste at its source.
– Developing treatment solutions for non recyclable scheduled waste.

Partnering for a Sustainable Future

Sabah Port SDN BHD

 

Hexagon Synergy and SPSB’s Commitment to Eco Friendly Maritime.

Sludge Dewatering and Sludge Cake Packaging for PPTSB 

Petronas Penapisan Terengganu SDN BHD

 

– Design, Build, Own & Operate the 1st onsite Oily Sludge Recovery Facility.
– Manage sludge to HSSB’s facility from collection/storage, dewater, drumming and packaging sludge cake, transfer to PP(T)SB in house Schedule Waste Shed.
– Successfully invented and supplied a homegrown technology ASDF (Advanced Sludge Dewatering Facility) for direct monetary saving to PPTSB. 

Term Contract for Scheduled Waste Management Encompass Plants

Pengerang Integrated Complex (PIC) Project

 

– Awarded 5 contracts as appointed scheduled waste contractor.
– Manage scheduled waste generated in PIC premise including packaging and strapping, collection and loading/transportation of scheduled waste.
– Organize in-house training with the Petronas team for both PRPC UF and Prefchem to share knowledge on the legal requirements and SWM guidelines.

Appointed Scheduled Waste Manager for Pengerang Integrated Complex

PETRONAS

 

– Appointed Scheduled Waste Manager since 2020 until current.
Technical Specialist for the Development of the Procurement Strategy and Plant Specification
for Kuala Lumpur Waste to Energy Private Public Partnership Project in Malaysia. 
UKAS, PRIME MINISTER’S DEPARTMENT
Lead Advisor Industrial Liquid Waste Detail Feasibility Study include, among others, Treatment Technology Assessment, National Strategic Planning and Administrative Control for The State of Qatar
UEM ENVIRONMENT
Design, Fabricate, Install, Own, Operate and Maintain Oily Sludge Pre Treatment Plant to complement and reduce operating cost of the existing treatment and recovery facilities.
KUALITI ALAM SDN BHD
Built and Transfer Medical Waste Incinerator for Suri Seri Begawan Hospital of Brunei Darussalam.
Sanitary Landfill Design inclusive of Leachate Treatment Plant and MRF at Sungai Udang, Melaka.
SRH CONSULTANT
Undertake the Detail Design of Bukit Jemalang Sanitary Landfill 
and Leachate Treatment Plant, Kemaman, Terengganu.
QISTINA CONSULTANT